MIL-PRF-49293B
4.3 First Article. Unless otherwise specified in the contract, the first article inspection
should be performed by the contractor (See 3.1).
4.3.1 First Article Units. The contractor should furnish 12 first article units of the Radiac
Set, AN/PDR-75.
- 10 -
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business