MIL-PRF-49149D(CR)
6.2 Acquisition requirements. Acquisition documents must specify the
following:
a.
Title, number, and date of this specification.
b.
Necessary actions by contractor in the event of a lot failure.
c.
Quantity and schedule for FAT testing for all line items and
disposition of FAT samples.
d.
Issue of DODISS to be cited in the solicitation, and if
required, the specific issue of individual documents referenced
(see 2.1 and 2.1.1).
e.
Statement identifying that the contractor must submit his
proposal for conformance inspection to include specific
requirements to be verified and the sampling plan to be used to
provide the desired confidence level.
f.
Statement specifying that FAT testing is, or is not, required.
g.
Statement identifying that the contractor must submit his
proposal for Environmental Stress Screening (ESS).
h.
Packaging requirements.
6.3
Definitions.
See 3.10.
6.4
Subject term keyword listing.
Power cutoff
Power output
Power restoration
6.5 Changes from previous issue. Marginal notations are not used in this
revision to identify changes with respect to the previous issue due to the
extensive changes.
Custodian:
Preparing Activity:
Army - CR
Army - CR
Project 5855-0092
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business