MIL-PRF-49151D(CR)
f.
Statement identifying that the contractor must submit
his proposal for conformance inspection to include specific
requirements to be verified and the sampling plan to be used to
provide the desired confidence level.
g.
Packaging requirements.
6.3
Definitions.
See 3.10.
6.4
Subject term keyword listing.
Regulation
6.5 Changes from previous issue. Marginal notations are not used in
this revision to identify changes with respect to the previous issue due to
the extensive changes.
Custodian:
Preparing Activity:
Army - CR
Army - CR
Project 5855-0184
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business