MIL-PRF-49384B(CR)
(This section contains information of a general or explanatory nature that may be helpful,
but is not mandatory).
6.1 Intended use. The Imager is intended for use in infrared imaging systems.
6.2 Acquisition requirements. Procurement documents should specify the following:
a. Title, number, and date of this specification.
b. First article tests are required.
(1) Time frame for submission of first article test reports when first article tests
are required.
(2) Time frame for approval of first article test reports when first article tests are
required.
c. Production delivery schedule.
(1) Defined in terms of monthly lots.
(2) Actions required relative to Group C failures (see 4.3.2.3.2).
d. Environmental pollution prevention measures are to be considered in the disposal of
packaging materials (see MIL-HDBK-742).
e. Address for delivery of first article samples.
f. Group C inspection monthly sample size to be established by the contracting office.
g. Packaging requirements (see 5.1).
h. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2.1 and 2.2.2).
i. Recommended application of MIL-STD-150 for the acceptance criteria for the optical
performance characteristics of Section 3.
6.3 Definitions.
6.3.1 Damage. Breakage, loosening, shifting, evidence of corrosion, or failure of any
finish, hardware, connection or component, and any degradation of regular performance to values
less than specified herein.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business