MIL-PRF-49384B(CR)
TABLE I. Visual inspections.
Inspection
Requirement
Verification paragraph
paragraph
Any as specified part or component
missing or damaged
3.4, 6.4.1
4.2.1
Weight not as specified
3.3.3
4.2.1
Marking not as specified
3.8
4.2.1
Workmanship not as specified
3.9
4.2.1
Treatment and painting
not as specified
3.7
4.2.1
Dimensions not as specified
3.3.2
4.2.1
Flange diameter
3.3.1
4.2.1
Flange mounting hole pattern
3.3.1
4.2.1
4.2.2 Tests. Upon successful completion of inspections specified in 4.2.1, perform the
tests in Table II in any order. Failure to meet any performance requirement shall constitute first
article failure.
TABLE II. First article inspection.
Inspection
Requirement paragraph
Test paragraph
Effective focal length
3.5.1
4.5.1
f/number
3.5.2
4.5.2
Linear distortion
3.5.3
4.5.3
Modulation transfer function
3.5.4
4.5.4
Relative illumination
3.5.5
4.5.5
Flange focal distance
3.5.6
4.5.6
Field of view
3.5.7
4.5.7
Optical transmittance
3.5.8
4.5.8
Deviation
3.5.9
4.5.9
Temperature shock
3.6.1
4.6.1
High temperature
3.6.2
4.6.2
Low temperature
3.6.3
4.6.3
Shock
3.6.4
4.6.4
Vibration
3.6.5
4.6.5
Altitude
3.6.6
4.6.6
4.2.3 Disposition of first article samples. First article samples shall not be considered as
part of the procurement quantities (see 6.2).
4.3 Conformance inspection.
4.3.1 Inspection. Inspection shall be as specified in 4.2.1.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business