MIL-PRF-49166C(CR)
TABLE I. Visual Inspections.
Inspection Requirement
Requirement paragraph
Inspection criteria
Any part or component
3.5
3.5
missing or damaged
Construction
3.4.1
See specification sheet
Weight not as specified
3.4.2
See specification sheet
Soldering not as specified
3.8
ANSI/IPC S-815A
Marking not as specified
3.10
See drawing or contract or
purchase order.
Workmanship not as
3.13
3.13
specified
Treatment and painting not
3.11
See drawing or
as specified
manufacturer's internal
Procedure
4.2.2 Tests. Upon successful completion of inspections specified in 4.2.1, perform the tests
of Table II in any order, except that the modulation transfer function (MTF) test shall follow the
high temperature test. Failure of any tests shall constitute failure of first article inspection.
TABLE II. First article inspection.
Inspection
Requirement
Test paragraph
paragraph
Variable scan frequency
3.6.1.1
4.5.1.1
Specific scan frequency
3.6.1.2
4.5.1.2
Synchronous scan frequency
3.6.1.3
4.5.1.3
Scan angle
3.6.1.4
4.5.1.4
Interlace
3.6.2
4.5.2
Scan direction
3.6.3
4.5.3
Power consumption
3.6.4
4.5.4
Scan efficiency
3.6.5
4.5.5
Scan jitter in azimuth
3.6.6
4.5.6
Scan jitter in interlace
3.6.7
4.5.7
Modulation transfer function
3.6.8
4.5.8
Temperature shock
3.7.1
4.6.1
High temperature
3.7.2
4.6.2
Low temperature
3.7.3
4.6.3
Shock
3.7.4
4.6.4
Vibration
3.7.5
4.6.5
Reliability
3.9
4.7
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business