MIL-PRF-49434A(CR)
Table III.
Initial production inspection.
Inspection
Requirement
Test
Subgroup
paragraph
paragraph
1
2
3
Output beam width
3.7.1
4.4.1
X
X
X
Output power
3.7.2
4.4.2
X
X
X
Modulation
3.7.3
4.4.3
X
X
X
Output peak wavelength
3.7.4
4.4.4
X
X
X
Spectral bandwidth
3.7.5
4.4.5
X
X
X
BR-shock
3.7.6.1
4.4.6.1
X
BR-vibration
3.7.6.2
4.4.6.2
X
Input current
3.7.7
4.4.7
X
X
X
Controls and adjustments
3.7.8
4.4.8
X
X
X
Neutral position
3.7.8.1
4.4.8.1
X
X
X
ON/OFF switch
3.7.8.2
4.4.8.2
X
X
X
Beam movement
3.7.8.3
4.4.8.3
X
X
X
Weight
3.7.9
4.4.9
X
X
X
Visual security
3.7.10
4.4.10
X
Size
3.7.11
4.4.11
X
Boresight alignment
3.7.12
4.4.12
X
X
X
Boresight repeatability
3.7.13
4.4.13
X
X
X
High temperature
3.8.1
4.5.1
X
Low temperature
3.8.2
4.5.2
X
Altitude
3.8.3
4.5.3
X
Temperature shock
3.8.4
4.5.4
X
Humidity
3.8.5
4.5.5
X
Immersion
3.8.6
4.5.6
X
Extended depth immersion
3.8.6.1
4.5.6.1
X
High intensity shock
3.8.7
4.5.7
X
Vibration
3.8.8
4.5.8
X
Transit drop
3.8.9
4.5.9
X
Sand and dust
3.8.10
4.5.10
X
Salt fog
3.8.11
4.5.11
X
Fungus
3.8.12
4.5.12
X
Explosive atmosphere
3.8.13
4.5.13
X
Reliability
3.9
4.6
X
EMI
S
3.10
4.7
X
12
ource: https://assist.dla.mil -- Downloaded: 2014-09-28T11:54Z
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business